Blood Tribe Public Works Mokawan Booster Pump Station Truck Fill
Description
Project is a new booster pump station that requires control and monitoring of the downstream pressure along with flow totalization for the truck fill and downstream. System was designed utilizing a Schneider M340 Programmable Logic Controller (PLC) and Redlion Graphite Touchscreen Human Machine Interface (HMI).
Candu provided the following services:
- Design control panel
- Manufactured the control panel
- PLC and local HMI programming
- Radio communication to the Standoff water treatment plant
- Modifications to the existing WonderWare SCADA system in Standoff
Project is scheduled for completion in the spring of 2017.